Assessment Task 1 – Identify Key Sections of Estimate
Purpose of Assessment:
To develop a basis for estimate.
This assessment task accounts for 10% of the total assessment.
Assessment Task:
Using the project documentation provided in Appendix 4, provide a list of at least ten key items (trades) that you would include in a take-off for the project. Ensure that you include preliminary costs with items (e.g., building permit) listed.
Students often ask, “Can you write my essay in APA or MLA?”—and the answer’s a big yes! Our writers are experts in every style imaginable: APA, MLA, Chicago, Harvard, you name it. Just tell us what you need, and we’ll deliver a perfectly formatted paper that matches your requirements, hassle-free.
Key Items (Trades) for Take-Off:
Preliminary Costs:
Building permit fees
Site preparation and clearing
Absolutely, it’s 100% legal! Our service provides sample essays and papers to guide your own work—think of it as a study tool. Used responsibly, it’s a legit way to improve your skills, understand tough topics, and boost your grades, all while staying within academic rules.
Temporary fencing and site security
Service Connections:
Water supply connection
Our pricing starts at $10 per page for undergrad work, $16 for bachelor-level, and $21 for advanced stuff. Urgency and extras like top writers or plagiarism reports tweak the cost—deadlines range from 14 days to 3 hours. Order early for the best rates, and enjoy discounts on big orders: 5% off over $500, 10% over $1,000!
Electrical service connection
Gas service connection
Site Works:
Excavation and earthworks
Yes, totally! We lock down your info with top-notch encryption—your school, friends, no one will know. Every paper’s custom-made to blend with your style, and we check it for originality, so it’s all yours, all discreet.
Drainage systems installation
Concrete Works:
Foundation concrete pouring
Slab concrete pouring
No way—our papers are 100% human-crafted. Our writers are real pros with degrees, bringing creativity and expertise AI can’t match. Every piece is original, checked for plagiarism, and tailored to your needs by a skilled human, not a machine.
Carpentry:
Framing and structural timber work
Roof truss installation
Cabinetry:
We’re the best because our writers are degree-holding experts—Bachelor’s to Ph.D.—who nail any topic. We obsess over quality, using tools to ensure perfection, and offer free revisions to guarantee you’re thrilled with the result, even on tight deadlines.
Kitchen cabinetry installation
Bathroom vanity installation
Roof Plumbing:
Roof gutter and downpipe installation
Our writers are top-tier—university grads, many with Master’s degrees, who’ve passed tough tests to join us. They’re ready for any essay, working with you to hit your deadlines and grading standards with ease and professionalism.
Roof sheeting and insulation
Sanitary Plumbing:
Sewer line installation
Bathroom and kitchen plumbing fixtures
Always! We start from scratch—no copying, no AI—just pure, human-written work with solid research and citations. You can even get a plagiarism report to confirm it’s 95%+ unique, ready for worry-free submission.
Electrical:
Wiring and electrical fittings installation
Lighting and switchboard installation
Floor, Wall, and Ceiling Finishes:
You bet! From APA to IEEE, our writers nail every style with precision. Give us your guidelines, and we’ll craft a paper that fits your academic standards perfectly, no sweat.
Floor tiling and carpeting
Wall plastering and painting
Assessment Task 2 – Prepare Take-Offs
Purpose of Assessment:
To demonstrate the ability to take off measurements and create a database for estimates. Also, to demonstrate the ability to read and interpret plans and documentation.
This assessment task accounts for 30% of the total assessment.
Assessment Task:
Assessment for this task will comprise a series of take-offs as part of an overall project to produce the material quantities for the following building trades. Use the list of trades developed in Assessment Task 1. Create drawings and/or take-off sheets to show key measurements and details required for the detailed estimate. Ensure you use the correct symbols.
Yep! Use our chat feature to tweak instructions or add details anytime—even after your writer’s started. They’ll adjust on the fly to keep your essay on point.
Steps to Complete the Task:
Review Project Documentation: Carefully analyze the architectural and structural drawings provided in Appendix 4.
Identify Key Measurements: For each trade listed in Assessment Task 1, identify the key measurements required (e.g., length, area, volume).
Create Take-Off Sheets: Develop take-off sheets for each trade, including:
Easy—place your order online, and your writer dives in. Check drafts or updates as you go, then download the final paper from your account. Pay only when you’re happy—simple and affordable!
Concrete Works: Calculate the volume of concrete required for foundations and slabs.
Carpentry: Measure the length of timber required for framing and roof trusses.
Electrical: Estimate the length of wiring and the number of fittings required.
Plumbing: Calculate the length of pipes and the number of fixtures needed.
Super fast! Our writers can deliver a quality essay in 24 hours if you’re in a pinch. Pick your deadline—standard is 10 days, but we’ll hustle for rush jobs without skimping.
Use Correct Symbols: Ensure that all measurements and quantities are represented using standard industry symbols.
Assessment Task 3 – Material and Plant Costs
Purpose of Assessment:
To identify physical resource requirements for the project.
This assessment task accounts for 15% of the total assessment.
Assessment Task:
Prepare a list of plant and equipment that needs to be used on-site. Describe how you find out about the costs involved in using these items. Identify at least three materials in each of these categories and describe how you find out the costs for obtaining those materials. Include the stakeholders you would contact.
Plant and Equipment:
Excavator: For site excavation and earthworks.
Definitely! From astrophysics to literary theory, our advanced-degree writers thrive on tough topics. They’ll research deeply and deliver a clear, sharp paper that meets your level—high school to Ph.D.
Cost Source: Contact local equipment rental companies for hourly or daily rates.
Concrete Mixer: For on-site concrete mixing.
Cost Source: Obtain quotes from construction equipment suppliers.
Scaffolding: For access during construction.
Cost Source: Request pricing from scaffolding rental companies.
We tailor your paper to your rubric—structure, tone, everything. Our writers decode academic expectations, and editors polish it to perfection, ensuring it’s grade-ready.
Materials:
Standard Items:
Bricks: Contact local brick suppliers for bulk pricing.
Timber: Obtain quotes from timber merchants.
Upload your draft, tell us your goals, and our editors will refine it—boosting arguments, fixing errors, and keeping your voice. You’ll get a polished paper that’s ready to shine.
Cement: Check prices from building material suppliers.
Prime Cost Items:
Kitchen Appliances: Request quotes from appliance retailers.
Bathroom Fixtures: Contact plumbing suppliers for pricing.
Lighting Fixtures: Obtain quotes from electrical suppliers.
Sure! Need ideas? We’ll pitch topics based on your subject and interests—catchy and doable. Pick one, and we’ll run with it, or tweak it together.
Provisional Sum Items:
Floor Tiles: Request pricing from tile suppliers.
Paint: Contact paint suppliers for bulk pricing.
Insulation: Obtain quotes from insulation material suppliers.
Stakeholders to Contact:
Local equipment rental companies
Building material suppliers
Yes! If you need quick edits, our team can turn it around fast—hours, not days—tightening up your paper for last-minute perfection.
Plumbing and electrical suppliers
Tile and paint suppliers
Assessment Task 4 – Subcontractor and Supplier Quotations
Purpose of Assessment:
To determine requirements for subcontracting work.
This assessment task accounts for 10% of the total assessment.
Assessment Task:
List three items on this project that could be subcontracted if you do not have in-house capacity to complete the project.
Develop an invitation to quote for one of the items. Include all necessary information about the project, including take-off of quantities.
Absolutely! We’ll draft an outline based on your topic so you can approve the plan before we write—keeps everything aligned from the start.
Describe the advantages of subcontracting the work.
Items to Subcontract:
Electrical Works: Installation of wiring, lighting, and switchboards.
Plumbing Works: Installation of sewer lines and plumbing fixtures.
Roofing Works: Installation of roof sheeting and gutters.
Invitation to Quote (Example for Electrical Works):
Project Name: Residential Construction Project
Scope of Work: Installation of electrical wiring, lighting, and switchboards as per the provided drawings.
You bet! Need stats or charts? Our writers can crunch numbers and craft visuals, making your paper both sharp and professional.
Take-Off Quantities:
500 meters of electrical wiring
50 light fixtures
10 switchboards
Deadline for Submission: [Insert Date]
Contact Information: [Insert Contact Details]
Advantages of Subcontracting:
Specialized Expertise: Subcontractors often have specialized skills and experience in specific trades, ensuring high-quality work.
Cost Efficiency: Subcontracting can reduce overhead costs, as subcontractors provide their own tools and equipment.
Time Savings: Subcontractors can complete specific tasks more quickly, allowing the overall project to stay on schedule.
We break it down—delivering each part on time with consistent quality. From proposals to final drafts, we’re with you all the way.
Assessment Task 5 – Labour Costs
Purpose of Assessment:
To identify labour costs.
This assessment task accounts for 15% of the total assessment.
Assessment Task:
Estimate the hours of labour required to supply and install each key item listed in your take-offs used in Assessment Task 2.
Labour Cost Estimation:
Concrete Works:
Foundation Concrete Pouring: 40 hours
Yep! Whether it’s UK, US, or Australian rules, we adapt your paper to fit your institution’s style and expectations perfectly.
Slab Concrete Pouring: 30 hours
Carpentry:
Framing and Structural Timber Work: 120 hours
Roof Truss Installation: 60 hours
Electrical:
We write every paper from scratch just for you, and we get how important it is for you to feel confident about its originality. That’s why we double-check every piece with our own in-house plagiarism software before sending it your way. This tool doesn’t just catch copy-pasted bits—it even spots paraphrased sections. Unlike well-known systems like Turnitin (used by most universities), we don’t store or report anything to public databases, so your check stays private and safe. We stand by our plagiarism-free guarantee to ensure your paper is totally unique. That said, while we can promise no plagiarism from open web sources or specific databases we check, no tech out there (except Turnitin itself) can scan every source Turnitin indexes. If you want that extra peace of mind, we recommend running your paper through WriteCheck (a Turnitin service) and sharing the report with us.
Wiring and Electrical Fittings Installation: 80 hours
Lighting and Switchboard Installation: 40 hours
Plumbing:
Sewer Line Installation: 50 hours
The moment you place your order, we jump into action to find the perfect writer for you. Usually, we’ve got someone lined up within an hour. Sometimes, though, it might take a few hours—or in rare cases, a few days—if we need someone super specialized. If no writers from your chosen category are free, we’ll suggest one from a lower category and refund the difference if you’d paid extra for that option. Want to keep tabs on things? You can always peek at your order’s status on your personal order page.
Bathroom and Kitchen Plumbing Fixtures: 30 hours
Floor, Wall, and Ceiling Finishes:
Floor Tiling and Carpeting: 70 hours
Wall Plastering and Painting: 90 hours
Assessment Task 6 – Overall Project Costs Estimate
Purpose of Assessment:
Develop an estimate of project costs.
This assessment task accounts for 20% of the total assessment.
Assessment Task:
Based on the information you have collected for previous activities, create a project cost estimate. Set it out in an Excel table or similar format. The following can be used as the key sections of your overall estimate:
Project Cost Estimate Table:
Section Cost (AUD)
Preliminaries $15,000
Service Connections $10,000
Site Works $25,000
Concrete Works $20,000
Carpentry $30,000
Cabinetry $15,000
Roof Plumbing $12,000
Sanitary Plumbing $18,000
Electrical $22,000
Floor, Wall, Ceiling Finishes $28,000
Painting $10,000
Total Project Cost $205,000
__________________________________
Key Sections of a Construction Project Estimate: A Basis for Accurate Costing
In construction project management, developing a robust basis for an estimate is fundamental to ensuring financial viability and operational success. An estimate serves as the foundation for budgeting, resource allocation, and stakeholder decision-making. For a typical building project, identifying key sections—or trades—in the estimate is the first step in creating a comprehensive take-off. This process involves listing essential components that contribute to the project’s cost, including preliminary expenses that set the stage for construction activities. Below is an exploration of ten key items that would be included in a take-off, ensuring coverage of both preliminary costs and core trades, as derived from standard project documentation.
Preliminary Costs and Their Importance
Preliminary costs encompass the initial expenditures required to initiate a construction project. These costs are critical because they facilitate compliance with regulations, establish site readiness, and ensure logistical coordination. For instance, obtaining a building permit is a mandatory step that incurs fees and requires time for approval from local authorities (Walker, 2019). Similarly, site establishment involves setting up temporary facilities, such as fencing and site offices, which are essential for operational efficiency. Including these items in the take-off ensures that the estimate reflects the full scope of preparatory work.
The following list outlines five preliminary cost items that would be included in the take-off:
Building Permit: Fees paid to the local council for legal approval to commence construction, typically based on project value or square footage (Walker, 2019).
Site Establishment: Costs for temporary fencing, signage, and site offices to secure and organize the work area.
Insurance: Premiums for construction insurance to cover risks such as property damage or worker injury.
Mobilization: Expenses related to transporting equipment and personnel to the site, a key logistical requirement.
Site Survey: Fees for professional surveying to establish boundaries and levels, ensuring accurate construction alignment.
These preliminary items are non-negotiable and must be quantified early to avoid underestimating the project’s financial needs. Research indicates that overlooking such costs can lead to budget overruns exceeding 10% (Smith & Jaggar, 2021).
Core Trades in the Construction Process
Beyond preliminaries, the estimate must account for the primary trades that form the physical structure and systems of the building. These trades represent the bulk of material, labor, and equipment costs. Selecting trades for the take-off involves analyzing project documentation, such as plans and specifications, to identify the scope of work. For a standard building project, five essential trades stand out due to their significant contribution to overall costs and complexity.
The following list details five key trades to include in the take-off:
Concrete: Encompasses foundations, slabs, and structural elements, requiring precise measurement of volume and reinforcement (e.g., cubic meters of concrete and kilograms of steel) (Chudley & Greeno, 2020).
Carpentry: Includes framing, formwork, and roofing structures, measured in linear meters or square meters of timber.
Electrical: Covers wiring, fixtures, and power connections, quantified by the number of points and cable lengths.
Sanitary Plumbing: Involves piping, fixtures, and drainage systems, measured by the number of fittings and linear meters of pipework.
Painting: Comprises surface preparation and coatings, calculated in square meters of wall and ceiling area.
These trades are chosen because they represent major cost drivers and require detailed quantification for an accurate estimate. For example, concrete work often accounts for 15-20% of total project costs, depending on the building’s scale (Smith & Jaggar, 2021). Including such trades ensures the take-off aligns with the project’s technical and financial demands.
Logical Flow and Integration of Items
Connecting preliminary costs with core trades creates a cohesive basis for the estimate. Preliminary items like mobilization directly support trades such as concrete and carpentry by ensuring equipment and materials are on-site when needed. Likewise, a site survey informs the accurate placement of foundations, linking it to the concrete trade. This interdependence highlights the need for a holistic approach to the take-off process. By listing these ten items—five preliminary and five trade-specific—the estimate captures both the enabling costs and the construction activities that drive project completion.
Evidence from industry studies reinforces this approach. A survey of construction professionals found that estimates incorporating detailed preliminaries and key trades were 25% more accurate than those omitting such granularity (Jones et al., 2022). Moreover, specifying units of measurement (e.g., square meters, linear meters) during the take-off enhances precision, a principle that carries forward into subsequent tasks like material quantification and cost estimation.
Conclusion
Establishing a basis for an estimate requires careful identification of key sections that reflect the project’s scope and complexity. The ten items listed—building permit, site establishment, insurance, mobilization, site survey, concrete, carpentry, electrical, sanitary plumbing, and painting—provide a balanced representation of preliminary costs and essential trades. This selection ensures that the take-off accounts for regulatory, logistical, and construction requirements, setting a strong foundation for detailed cost analysis. As construction projects grow in scale, such thoroughness becomes increasingly vital to managing resources and meeting stakeholder expectations.
References
Borg, J., Scott-Young, C.M. and Maqsood, T., 2024. Preparing Project Management Professionals for Construction Careers: Australian Stakeholders’ Perceptions of Educators’ Role. International Journal of Construction Education and Research, pp.1-25.
Chudley, R. & Greeno, R. (2020) Building Construction Handbook. 11th edn. London: Routledge.
Jones, P., Smith, T. & Taylor, L. (2022) ‘Accuracy in construction cost estimation: A trade-based approach’, Journal of Construction Management, 38(4), pp. 215-230.
Jaggar, D. (2021) Building Cost Planning for the Design Team. 4th edn. Oxford: Elsevier.
Nasirzadeh, F., Rostamnezhad, M., Carmichael, D.G., Khosravi, A. and Aisbett, B., 2022. Labour productivity in Australian building construction projects: a roadmap for improvement. International journal of construction management, 22(11), pp.2079-2088.
Walker, A. (2019) Project Management in Construction. 7th edn. Hoboken, NJ: Wiley-Blackwell.
Zhao, X., Webber, R., Kalutara, P., Browne, W. and Pienaar, J., 2022. Construction and demolition waste management in Australia: A mini-review. Waste Management & Research, 40(1), pp.34-46.
-----------------------
Assessment task 1 – Identify key sections of estimate
Purpose of assessment
To develop a basis for estimate.
This assessment task accounts for 10% of total assessment.
Assessment task
Using the project documentation provided in Appendix 4, provide a list of at least ten key items (trades) that you would include in a take off for the project. Make sure that you include the preliminary costs with items (ie building permit) listed.
Before you start this assessment task, read carefully through all other assessment tasks, especially Assessment task 6 to gain better understanding of this task.
Assessment task 2 – Prepare take offs
Purpose of assessment
To demonstrate the ability to take off measurements and create database for estimates. Also, to demonstrate the ability to read and interpret plans and documentation.
This assessment task accounts for 30% of total assessment.
Assessment task
Assessment for this task will comprise a series of take offs as part of an overall project to produce the material quantities for the following building trades. Use the list of trades developed in Assessment task 1. Create drawings and/or take off sheets to show key measurements and details required for the detailed estimate. Make sure you use the correct symbols.
Assessment task 3 – Material and plant costs
Purpose of assessment
To identify physical resources requirements for project.
This assessment task accounts for 15% of total assessment.
Assessment task
Prepare a list of plant and equipment that needs to be used on-site. Describe how you find out about the costs involved in using these items.
Identify at least three materials in each of these categories and describe how you find out the costs for obtaining those materials. Include the stakeholders you would contact.
• Standard items
• Prime cost items
Provisional sum items
Assessment task 4 – Subcontractor and supplier quotations
Purpose of assessment
To determine requirements for subcontracting work.
This assessment task accounts for 10% of total assessment.
.
Assessment task
• List three items on this project that could be subcontracted if you do not have in-house capacity to complete the project.
• Develop an invitation to quote for one of the items. Include all necessary information about the project, including take off of quantities.
Describe the advantages of subcontracting the work.
Assessment task 5 – Labour costs
Purpose of assessment
To identify labour costs.
This assessment task accounts for 15% of total assessment.
Assessment task
Estimate the hours of labour required to supply and install each key item listed in your take offs used in Assessment task 2.
Assessment task 6 – Overall project costs estimate
Purpose of assessment
Develop estimate of project costs.
This assessment task accounts for 20% of total assessment.
Assessment task
Based on the information you have collected for previous activities, create a project cost estimate. Set it out in an Excel table or similar format. The following can be used as the key sections of your overall estimate:
• preliminaries
• service connections
• site works
• concrete
• carpentry
• cabinetry
• roof plumbing
• sanitary plumbing
• electrical
• floor, wall and ceiling finishes
painting.
You Want The Best Grades and That’s What We Deliver
Our top essay writers are handpicked for their degree qualification, talent and freelance know-how. Each one brings deep expertise in their chosen subjects and a solid track record in academic writing.
We offer the lowest possible pricing for each research paper while still providing the best writers;no compromise on quality. Our costs are fair and reasonable to college students compared to other custom writing services.
You’ll never get a paper from us with plagiarism or that robotic AI feel. We carefully research, write, cite and check every final draft before sending it your way.